Villas del Mar

Type: Beach Club, Villas Residenciales, & Obra Exterior Location: Desarrollo Palmilla, Villas del Mar, San Jose del Cabo, B.C.S.

Phase I y II


1 Building (Kitchen, Restaurant, bar, Gimmasio, terrace, cellar, warehouse, and parking.

Construction Duration: 3 , 07-2004 a 10-2004
Status:Finished

Phase III

10 residential villas with pond and stone walls.

Construction Area: 12,791 m2
Construction Duration: 1 year 1 month, 01-2004 a 02-2005
Status: Finished

Phase IV

8 residential buildings with pool and stone walls, 14 residential properties with pool and stone walls. 14 small residential homes with pools and stone walls.

Construction Area: 42,706 m2
Construction Duration:
  • Phase IV-D 10-2000 to 01-2002
  • Phase IV-E 01-2006 to 02-2007
  • Phase IV-F 07-2005 to 09-2006
Status: Finished

Phase V

14 "casita" residences with pool, main infrastructure, access, and roads. 5 small residential homes, and stone walls. 16 "casita" residences with pool access stairs. 12 "Entradas" residences with office.

Construction Area: 41,972 m2
Construction Duration:
  • Phase V 08-2000 to 09-2002
  • Phase V-B 09-2002 to 05-2004
  • Phase V-C 01-2004 to 09-2005
  • Phase V-D 01-2006 to 11-2006
Status: Finished

Phase V

Earth moving: Cortes Hill, leveling of platforms, cleaning of slopes and construction of wall for beach protection.


Phase VI

6 Casitas model residences with garage and guest casita.

Construction Duration:
  • Phase VII-F June 2007 to March 2009
Status: in process.