All projects Residential Residential Development Hospitality Commercial Infrastructure Government Projects

1

2

T2 Aeropuerto SJD Waste Water treatment plant

Infrastructure

Installation of equipment for a treatment plant with a production capacity of 2 liters per second of water from the sanitary system of air terminals in an area of 1,453.13 Sq. Ft. complying with the official Mexican standard NOM 003- Semarnat- 1997 with the capacity to biodegrade up to 47.7 kg. Daily organic loading with an average flow of 6,102 cubic feet per day. It has an irrigation system with water product of the treatment for landscaped areas.

Status:

Finished

Location:

San José del Cabo, B.C.S.